Before the First Draw: How Developers Can Fund Pre-Construction Soft Costs
Property development starts well before excavation, concrete or framing. Architects need retainers. Planners, engineers and surveyors issue invoices. Council and authority charges fall due. Interest, rates and land tax continue while approvals move through the system.
These are commonly called construction soft costs. They can place a project under pressure precisely when a senior construction facility is not yet available for drawdown. A site may have substantial value and a sound end project, yet still face a genuine cash gap before the first progress claim.
The answer is not simply to borrow whatever is available. Pre-construction finance should fund a defined pathway to the next bankable milestone, with the amount, security, total cost and repayment event visible from the beginning.
What counts as a construction soft cost?
Soft costs are project expenses that support acquisition, design, approval, finance, delivery and sale but are not permanently incorporated into the finished building.
- architecture, design and documentation;
- town planning and development applications;
- surveying, engineering, geotechnical and environmental reports;
- building permits, infrastructure contributions and authority charges;
- quantity surveying, valuation and project-management fees;
- legal, accounting and finance expenses;
- insurance, council rates, land tax and site holding costs;
- marketing, sales commissions and display material;
- loan establishment expenses and capitalised interest; and
- contingency for delays, redesigns and additional professional work.
A feasibility that records only land and building costs is incomplete. Soft costs and finance costs can determine whether the project reaches construction at all.
Why the funding gap appears before construction
A conventional construction loan is usually controlled through conditions and staged drawdowns. The lender may require approvals, an acceptable valuation, a building contract, quantity-surveyor confirmation, evidence of equity and satisfaction of all conditions before releasing construction funds.
That creates several possible timing gaps:
- The invoice arrives before the facility. Consultants and authorities need to be paid to produce the documents required for finance approval.
- Developer equity must be used first. The senior lender may require the sponsor’s contribution to be fully applied before debt is drawn.
- The expense is outside the approved budget. A cost omitted from the feasibility may not automatically qualify for reimbursement.
- Historical costs may not be reimbursed. Some lenders will recognise previously paid expenses as equity but will not advance cash against them retrospectively.
- Time increases the requirement. Approval delays extend interest, rates, tax and other holding expenses.
The problem is therefore both financial and procedural. The developer needs capital, but also needs to show exactly how that capital moves the project toward approval, construction or refinance.
Can the construction facility include soft costs?
Sometimes. Eligible development soft costs may be included where they are part of the lender-approved feasibility, supported by contracts or invoices, consistent with the approved purpose and accepted within the lender’s cost-to-complete calculation.
The treatment differs between lenders. Some may fund selected professional fees and capitalised interest. Others may restrict draws to certified construction expenditure or require soft costs to be paid from developer equity. The facility agreement, approved budget and drawdown rules matter more than a general promise that “development costs are covered”.
Before accepting a facility, ask:
- Which soft-cost categories are eligible?
- Can costs incurred before settlement be reimbursed?
- Must developer equity be contributed first?
- How are invoices and draw requests verified?
- Are interest, fees and contingency fully allowed for?
- What happens if approval or construction is delayed?
Six ways a pre-construction gap may be structured
1. Developer equity
Cash equity is usually the cleanest source because it does not introduce another lender, security position or maturity date. The trade-off is liquidity: using every available dollar before construction can leave too little capacity for contingencies.
2. Equity release through a first mortgage
Where the site has verified usable equity, a refinance or increased first-ranking facility may release capital for approved pre-construction expenditure. The calculation must include the payout, new interest and fees—not merely the difference between the owner’s estimated value and current mortgage.
3. A development facility with an approved soft-cost allowance
The most integrated structure is a development loan that expressly includes eligible planning, consultant, holding and finance expenses in its total sources and uses. For a broader explanation, review Zip Funding’s property development finance guide.
4. Second-mortgage finance
A short-term second mortgage may sit behind an acceptable senior lender and fund a finite pre-construction requirement. Combined leverage must include the first mortgage, second mortgage, retained or capitalised interest, fees and every other secured claim. Existing-lender consent or a priority agreement may also be required. See how second-mortgage loans are assessed.
5. Bridging finance
A bridge can align an immediate payment with a clearly timed event such as construction refinance, sale of another asset, settlement receipt or approval of a larger facility. It becomes dangerous when the “bridge” has no evidenced destination. Compare the timing, total repayment and extension position—not only the starting rate. Explore bridging finance.
6. Mezzanine or private credit
Where senior debt and sponsor equity do not cover the complete capital stack, a subordinated layer may bridge a documented gap. This capital is generally more expensive and requires clear ranking, intercreditor and exit arrangements. It should solve a finite shortage while leaving enough project margin to absorb delay and cost pressure. Read about mezzanine finance.
Choose the structure by the next milestone
| Immediate requirement | Possible structure | Evidence that matters |
|---|---|---|
| Planning, design and authority fees | Equity, site refinance or short bridge | Approval pathway, invoices, current value, existing debt |
| Deposit or site settlement before development approval | Acquisition or bridging facility | Contract, valuation, equity, planning strategy and exit |
| Approved project awaiting senior construction settlement | Second mortgage or bridge | Senior term sheet, conditions, cost plan and settlement timetable |
| Gap between senior debt and total project cost | Mezzanine or additional equity | Full capital stack, GRV, margin, priority and downside exit |
| Overrun after work has commenced | Completion or recapitalisation facility | QS cost to complete, defects, programme, contingency and exit |
A practical soft-cost funding example
Consider a developer with a site accepted at $2.5 million and existing secured debt of $1.1 million. The project needs $300,000 for planning, consultants, authority charges, insurance and holding costs before senior construction drawdowns can begin.
The headline equity appears to be $1.4 million, but that is not the amount available to borrow. A lender will apply its accepted leverage, deduct existing debt and allow for interest, establishment fees, valuation and legal costs. It will also test whether the $300,000 is sufficient to reach the next funding milestone.
Depending on the complete position, the developer might:
- increase or refinance the first mortgage;
- arrange a short second mortgage behind the existing lender;
- include eligible costs within the development facility; or
- use a bridge repayable from documented construction refinance.
The correct structure is the one that leaves the project fully funded through the relevant stage—not merely the one that pays today’s invoices.
Red flags that make soft-cost funding harder
- The cost schedule does not separate paid, committed and forecast expenses.
- The borrower’s value is unsupported or materially above the lender’s valuation.
- Existing mortgages, caveats, tax liabilities or priority issues are incomplete.
- The short-term facility matures before construction finance can realistically settle.
- Capitalised interest and fees are excluded from total leverage.
- The feasibility has no contingency for approval or construction delay.
- The proposed exit depends solely on future refinance without evidence of likely eligibility.
What to send for a meaningful assessment
A concise, reconciled information pack usually produces a more useful response than a long narrative:
- property address, ownership and current title;
- current mortgage statements and written payout figures;
- current site value and proposed gross realisation value;
- planning, permit and authority status;
- detailed feasibility separating land, hard costs, soft costs, finance and contingency;
- paid invoices, unpaid invoices and committed consultant contracts;
- building contract, programme and quantity-surveyor material where available;
- developer experience and entity information;
- exact net funding requirement and deadline; and
- primary exit plus a realistic fallback.
Frequently asked questions
Can architect and engineering fees be financed?
They may be, depending on the lender and facility. They are stronger candidates when documented, included in the feasibility and necessary to reach an approved project milestone.
Can a lender reimburse soft costs already paid?
Possibly, but not automatically. A lender may recognise historical expenditure as contributed equity without releasing that amount back to the developer. Confirm retrospective-cost treatment before relying on reimbursement.
Can interest be capitalised?
Selected facilities may retain or capitalise interest where leverage and the exit permit. Capitalised interest still increases the amount owed and must be included in total exposure and repayment calculations.
Can soft costs be funded before a building permit is issued?
Potentially. The lender will examine the planning pathway, current security value, existing debt, intended use of funds, time required to obtain the permit and the event expected to repay or refinance the facility.
Is a second mortgage always faster?
No. Timing depends on valuation, title, first-lender consent, priority arrangements, borrower information and legal documentation. A complete file can improve execution, but no settlement timeframe should be assumed.
Need capital before the build can begin?
Zip Funding assesses eligible business-purpose development scenarios across first mortgages, second mortgages, bridging and private-credit structures. Send the property address, existing debt, accepted or estimated value, approvals, soft-cost schedule, amount required, deadline and proposed exit for an initial review.
Call: 0439 462 664
Email: info@zipfunding.com.au
General information only. This article does not constitute financial, legal, taxation or investment advice. Business-purpose finance only. Eligibility, amount, security, ranking, valuation, LVR, pricing, fees, term, drawdowns, timing and approval depend on lender criteria, verification, due diligence and final documents. No outcome or settlement timeframe is guaranteed.